How Procore’s own tools feed each other, laid out left to right in project order. Click any tool to see what it sends and receives. Pick a workflow to trace it step by step. Every link carries its source.

67Tools
250Connections
245Cited to a current Procore page
16Workflows traced
20AI agents mapped
Matt works for Procore. The risks in this guide don't care what software you use.  ·  Procore data as of 2026-10-29 · Map last updated 2026-11-03

Procore is a platform, which means the value is in the handoffs: an RFI that becomes a change event, a change event that becomes a commitment change order, a commitment that becomes an invoice that becomes a payment that lands in accounting. This map draws only those purpose-built handoffs — create, convert, send, sync — and leaves out the generic “Related Items” links that nearly every tool has. If a line is on the map, a Procore support page describes it, or the line says it doesn’t.

Purpose-built only

Create, convert, send, pull, sync. Generic cross-links are left off so the picture shows how the platform is designed to move data.

Sourced, or labeled

Solid lines link to the current Procore support article or developer reference. Dashed lines are documented only on Procore’s previous support site, with no current page yet, and link there. Handoffs the public docs don’t describe aren’t drawn.

Specialty-contractor lens

Owner-side tools are left out. Beta and limited-availability tools carry a badge and a source, dated, so you can tell what has changed since.

Trace a workflow
Find
Area
Documented on a current Procore page (support site or developer reference) Legacy Procore source: documented on Procore's previous support site; no current page yet. Sends to Receives from

Use “Show full size” for larger labels. On a phone the map scrolls sideways, and the list view below shows the same connections without scrolling.

List view: pick a tool and see what it sends and receives

Pick any tool above, or trace a workflow.

Credit where it’s due

This map started with Nick Trejo, my teammate on Procore’s enterprise specialty contractor team, who built the first version and shared it with me. If you want to go deeper (mapping your own processes and digitizing them), talk with your Procore account team and Louis Tigh at Strategic Adoption. Together they can help you trim your tech stack, raise adoption, and make decisions from data your team enters once.

  • Bid → Estimate → Budget → ERP — Awarded pricing becomes the project budget and syncs to accounting: Bid Management → Estimating → Budget → ERP Integrations
  • Bid → Commitment → Invoice → Pay — Awarded sub is contracted, billed against its SSOV, paid, and the payment syncs: Bid Management → Commitments → Invoicing → Procore Pay → ERP Integrations
  • RFI → Change Event → CO → Budget — A design question becomes priced scope and committed cost: RFIs → Change Events → Commitment Change Orders → Commitments → Budget
  • RFI → Prime CO → Owner billing — Owner-side change is approved and billed, with the invoice exported: RFIs → Change Events → Prime Change Orders → Prime Contracts → Invoicing → ERP Integrations
  • Clash → RFI → Change — A model clash is formalized and priced: Models → Coordination Issues → RFIs → Change Events
  • Inspection → Observation → Change — A failed item becomes a tracked observation and, if needed, a budget change: Inspections → Observations → Change Events → Budget
  • Specs → Submittals — Spec book generates the submittal log, linked to drawings: Specifications → Submittals → Drawings
  • Timecards → Daily Log → Budget (labor productivity) — Timesheets and the Daily Log share the same timecard entries. Their hours and installed quantities land in the Budget's Labor Productivity Cost view, next to budgeted hours and quantities. That view needs Procore's Resource Tracking tools and an admin to set it up; other budget views can add a 'Timesheet Hours' column: Timesheets (Project) → Daily Log → Budget
  • Estimate → Budget → Timesheets → Field Production Report — Estimated hours become budgeted pickers; installed units and hours report against them: Estimating → Budget → Timesheets (Project) → Field Productivity
  • Incident → Corrective Action → Observation — An incident's corrective or preventive action is assigned and tracked as an observation; an action plan can then link that observation as a record: Incidents → Observations
  • Equipment → Timesheet → Budget — Equipment hours logged on timesheets are visible in the budget: Equipment → Timesheets (Project) → Budget
  • Resource Planning → Timesheets → Payroll — Resource Planning syncs people into the Directory; anyone in the Directory marked as an employee of your company can be added to project timesheets, which roll up for weekly approval at company level. For payroll, an integration reads the timecard data through the REST API ('List all Timesheets' per project, or 'List Timecard Data' company-wide); Sage 300 CRE users also have a documented file export: Resource Planning → Directory → Timesheets (Project) → Timesheets (Company) → Webhooks / REST API
  • Meeting → Change Event — A cost-impacting discussion becomes a change event, linked back to the meeting it came from: Meetings → Change Events
  • Change Event → RFQ → Commitment Change Order — Subs price the change event's lines through RFQs. When a reviewed quote is set to 'Pending Final Approval', the commitment change order you create from those lines fills in with the quoted amounts, and the approved CCO revises the commitment: Change Events → RFQs → Commitment Change Orders → Commitments
  • Bid Board → Portfolio → Estimating → Budget — The estimate does not jump to the Budget on its own. Adding the won project to Portfolio creates the Procore project and carries the estimate into its Estimating tool; someone then sets the primary estimate and runs Send to Budget, which copies its cost codes and amounts in as budget line items (Project Financials required): Bid Board → Portfolio → Estimating → Budget
  • PO → Receipt → Supplier Invoice — Materials you receive against your purchase order are posted as a receipt, and Procore drafts the supplier's invoice on that PO for you to review and pay. This is accounts payable; your own billing to the GC runs through prime contract invoicing: Commitments → Materials → Invoicing

Jump to a lane: Precon & Company · Design & Documents · Project Communication · Field & Quality · Change Management · Contracts & Cost · Resource Management · Company & Platform · Payment & Accounting

Precon & Company

Directory

Precon & Company · Company and project level · 11 out · 0 in

Procore support

Company and project directory of companies, people, permissions and vendor insurance records.

Sends to / links with · 11
  • Bid Management — Invite bidding companies from the Directory (or add new ones from the bid tool). source
  • Daily Log — Resources for Scheduled Work must exist in the Project Directory. source
  • Equipment — Link rented/subcontracted equipment to a vendor. source
  • Resource Planning — Two-way sync of first/last name, employee ID, mobile, email, status; job title RP→Directory only. source
  • 360 Reporting — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Insurance (Directory) — Insurance documents are recorded on the company profile in the Directory (system of record). source
  • ERP Integrations — Vendors sync (Vista: both; Workday: Workday→Procore). source
  • Crews — Adding a worker in Crews also creates the worker as a contact in the Project and Company Directory; edits sync either way. source
  • Conversations — Group conversations import and stay in sync with the project Directory; distribution groups are selectable as recipients. source
  • Planroom — Bidders must be in the Company Directory before they can be invited; adding a company to a bid package grants its bidders Planroom access. source
  • Timesheets (Project) — Timesheets draw people from the Directory: only people in the Directory who are marked as employees of your company can be added to a timesheet. source
Receives from · 0
  • Nothing purpose-built.

Construction Network GAUS/CA per the cited page

Precon & Company · Company level · 2 out · 0 in

Procore support

Procore's network of companies (US and Canada) used to find and invite bidders.

Sends to / links with · 2
  • Bid Management — Invite bidders from the Procore Construction Network (US/CA). source
  • Bid Board — Invitations received through the Procore Construction Network land in the Bid Board. source
Receives from · 0
  • Nothing purpose-built.

Bid Management GA"enhanced experience"

Precon & Company · Project level · 5 out · 5 in

Procore support

Bid packages, bidder invitations, leveling and award to a commitment.

Procore AI agents that act here: Bid Analyst Agent, Bid Leveling Agent

Sends to / links with · 5
  • Estimating — Link leveled bid values to the estimate ("Show Bid in Estimating" → "Set as Estimate Value"). source
  • Commitments — Award a bid and convert it to a subcontract or purchase order. source
  • Estimating — Create bid packages directly from an estimate; awarded bids can update the estimate. source
  • Planroom — Bid packages created in a project's Bidding tool are published to invited bidders in the Planroom, where they download bid documents. source
  • Bid Board — Bid invitations sent from other companies' Bidding tools appear in the Bid Board; intent-to-bid responses notify the sender. source
Receives from · 5
  • Directory — Invite bidding companies from the Directory (or add new ones from the bid tool). source
  • Construction Network — Invite bidders from the Procore Construction Network (US/CA). source
  • Drawings — Drawings go out with bid packages. source
  • Specifications — Spec sections go out with bid packages. source
  • Planroom — Bidders submit bids, intent to bid and pre-bid questions in the Planroom; the solicitor reviews them in the Bidding tool. source

Estimating

Precon & Company · Project level · 6 out · 4 in

Procore support

Procore Estimating: estimates, proposals, bid packages from estimates, send to Budget and Change Events.

Sends to / links with · 6
  • Budget — Send to Budget copies the primary estimate's line items into the project Budget; its cost codes and amounts become the budget lines (Project Financials required). source
  • Change Events — Send an estimate change order to the Change Events tool (costs only or full estimate with adjustments); budget codes update. source
  • Bid Management — Create bid packages directly from an estimate; awarded bids can update the estimate. source
  • Prime Contracts — Create a prime contract from an estimate. source
  • Commitments — Create a purchase order from an estimate. source
  • Cost Catalog — Create new catalog items directly from a takeoff or estimate. source
Receives from · 4
  • Bid Management — Link leveled bid values to the estimate ("Show Bid in Estimating" → "Set as Estimate Value"). source
  • Takeoff — Takeoff quantities flow directly into the estimate. source
  • Cost Catalog — Catalog parts and assemblies are selected into estimate groups as line items, and pulled into takeoff layers via Browse Catalog. source
  • Portfolio — Adding a won Bid Board project to Portfolio creates the Procore project, and you keep working on the same estimate in that project's Estimating tool. source

Takeoff GAfeature of Estimating

Precon & Company · Project level · 1 out · 2 in

Procore support

Quantity takeoff inside Procore Estimating from uploaded plans or 3D models; "Takeoff data flows directly to" the estimate.

Sends to / links with · 1
Receives from · 2
  • Drawings — Perform takeoff on uploaded plans (Standard permission on Drawings needed for layer actions). source
  • Models — Perform 3D model takeoffs (Read Only on Models required). source

Insurance (Directory) GAnot a standalone tool; lives in Directory

Precon & Company · Company and project level · 1 out · 1 in

Procore support

Vendor insurance documents held on the Directory company profile; status surfaces on the commitment Compliance tab and gates Procore Pay.

Sends to / links with · 1
  • Commitments — Commitment Compliance tab shows Directory insurance entries and an automatic Compliant / Not Compliant status. source
Receives from · 1
  • Directory — Insurance documents are recorded on the company profile in the Directory (system of record). source

Portfolio GApage titled "Procore Home (Legacy Company Portfolio)"

Precon & Company · Company level · 3 out · 2 in

Procore support

Company-level list/map of projects; project creation, templates, Send to ERP.

Sends to / links with · 3
  • Resource Planning — Push projects from the Portfolio tool to Resource Planning (recommended when an ERP is integrated). source
  • ERP Integrations — "Send to ERP" during project creation; projects/jobs sync both ways (Vista, Workday). source
  • Estimating — Adding a won Bid Board project to Portfolio creates the Procore project, and you keep working on the same estimate in that project's Estimating tool. source
Receives from · 2
  • Programs — Projects are grouped into programs for sorting in the portfolio. source
  • Bid Board — Add a Bid Board project to the Portfolio tool, creating a full Procore project (optionally from a template). source

Programs GAmodernized layout 2025-01-08

Precon & Company · Company level · 1 out · 0 in

Procore support

Groups projects into named programs for sorting.

Sends to / links with · 1
  • Portfolio — Projects are grouped into programs for sorting in the portfolio. source
Receives from · 0
  • Nothing purpose-built.

Cost Catalog

Precon & Company · Company level · 2 out · 2 in

Procore support

Company-level store of material parts and assemblies with values, used during takeoff and estimating. Procore supplies predefined materials; companies add and customize their own.

Sends to / links with · 2
  • Estimating — Catalog parts and assemblies are selected into estimate groups as line items, and pulled into takeoff layers via Browse Catalog. source
  • Bid Board — Catalog items are used in Bid Board's Estimating and Takeoff tabs. source
Receives from · 2
  • Estimating — Create new catalog items directly from a takeoff or estimate. source
  • ERP Integrations — ERP cost codes can be added to the Cost Catalog for ERP-integrated companies and applied across Estimating and Bid Board; they carry to the budget when an estimate is sent. source

Planroom

Precon & Company · Company level · 2 out · 2 in

Procore support

The bidder-facing side of a bid solicitor's Bidding tool: invited bidders view bid packages and submit bids here.

Sends to / links with · 2
  • Bid Management — Bidders submit bids, intent to bid and pre-bid questions in the Planroom; the solicitor reviews them in the Bidding tool. source
  • Bid Board — Accounts with a Bid Board license open invitations in the sender's Planroom but view and submit from their own Bid Board. source
Receives from · 2
  • Bid Management — Bid packages created in a project's Bidding tool are published to invited bidders in the Planroom, where they download bid documents. source
  • Directory — Bidders must be in the Company Directory before they can be invited; adding a company to a bid package grants its bidders Planroom access. source

Bid Board GAFree Procore accounts that use Bid Board are a limited release in the US and Canada. source

Precon & Company · Company level · 4 out · 3 in

Procore support

Where a company manages every bid it has been invited to: intent to bid, takeoff and estimating, and moving awarded work into the Portfolio as a live project.

Sends to / links with · 4
  • Bid Management — Bid invitations sent from other companies' Bidding tools appear in the Bid Board; intent-to-bid responses notify the sender. source
  • Portfolio — Add a Bid Board project to the Portfolio tool, creating a full Procore project (optionally from a template). source
  • Budget — A Bid Board estimate reaches the Budget only after the project is added to Portfolio; Send to Budget is then run from the project's Estimating tool. source
  • Commitments — Create a purchase order in Commitments from a Bid Board estimate (after the estimate is sent to budget). source
Receives from · 3
  • Cost Catalog — Catalog items are used in Bid Board's Estimating and Takeoff tabs. source
  • Planroom — Accounts with a Bid Board license open invitations in the sender's Planroom but view and submit from their own Bid Board. source
  • Construction Network — Invitations received through the Procore Construction Network land in the Bid Board. source

Design & Documents

Drawings

Design & Documents · Project level · 16 out · 3 in

Procore support

Drawing sets and markups; the most-linked tool.

Procore AI agents that act here: Bid Analyst Agent, Change Analyst Agent, Contract Review Agent, Deep Search Agent, Drawing Analyst Agent, Drawings and Specs Specialist Agent, Procurement Log Creator Agent, RFI Agent, Scope Writer Agent, Site Safety Agent

Sends to / links with · 16
  • Bid Management — Drawings go out with bid packages. source
  • RFIs — Create or link RFIs on a drawing markup. source
  • Submittals — Link submittals on a drawing markup. source
  • Documents — Link documents on a drawing markup. source
  • Punch List — Add punch list items to a drawing / link on markup. source
  • Observations — Link observations on a drawing markup. source
  • Inspections — Link inspections on a drawing markup. source
  • Coordination Issues — Link coordination issues on a drawing markup. source
  • Correspondence — Link correspondence items on a drawing markup. source
  • Takeoff — Perform takeoff on uploaded plans (Standard permission on Drawings needed for layer actions). source
  • Models — Map 2D PDF sheets to the 3D model (multisheet mapping). source
  • Action Plans — Attach drawings as action plan attachments. source
  • Locations — Generate the location hierarchy from drawings. source
  • 360 Reporting — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Conversations — Link a drawing or attach drawing files to a message. source
  • Connection Manager — Published drawings and drawing areas sync from an upstream project to a downstream project and stay in sync; markups and custom fields are excluded. source
Receives from · 3

Specifications GASubmittal Builder: US/CA/AU, English

Design & Documents · Project level · 3 out · 1 in

Procore support

Spec book by section; Submittal Builder generates submittals.

Procore AI agents that act here: Bid Analyst Agent, Deep Search Agent, Drawings and Specs Specialist Agent, Procurement Log Creator Agent, RFI Agent, Scope Writer Agent, Submittal Review Agent

Sends to / links with · 3
  • Bid Management — Spec sections go out with bid packages. source
  • Submittals — Submittal Builder generates submittals from vector-PDF spec sections. source
  • 360 Reporting — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
Receives from · 1

Models

Design & Documents · Project level · 4 out · 1 in

Procore support

3D model viewing; 2D sheet mapping; issues from viewer.

Sends to / links with · 4
Receives from · 1
  • Documents — Publish models to the Models tool from the Documents tool. source

Coordination Issues

Design & Documents · Project level · 4 out · 2 in

Procore support

Clash/design issues; elevate to RFI.

Sends to / links with · 4
  • Drawings — Link coordination issues on a drawing markup. source
  • RFIs — Elevate a coordination issue to a new or existing RFI (status → Elevated/Released). source
  • 360 Reporting — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Conversations — Link a coordination issue in a message. legacy source
Receives from · 2
  • Models — Create a coordination issue directly from the model viewer's Issues side panel. source
  • Custom Fields — Company Admin custom fields/fieldsets apply to these 24 tools. source

Documents

Design & Documents · Company and project level · 7 out · 1 in

Procore support

Project file repository; models can be published from it.

Procore AI agents that act here: Change Analyst Agent, Scope Writer Agent

Sends to / links with · 7
  • Drawings — Link documents on a drawing markup. source
  • Models — Publish models to the Models tool from the Documents tool. source
  • Action Plans — Attach files from Documents (and Drawings, Forms) as action plan records. source
  • 360 Reporting — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Transmittals — Add a document as a transmittal line item. source
  • Conversations — Link a document or attach files from Documents to a message. source
  • Assets — Pull model objects from a BIM file in Documents or Document Management, filter by property, and map them to asset types for bulk import; assets can be viewed in the 3D model. source
Receives from · 1

Document Management GANot available to US accounts (GA in UK/IE/AU/NZ; "not yet for U.S. accounts") source

Design & Documents · Project level · 2 out · 2 in

Procore support

Attribute-driven document control with approval workflows; import into Drawings; SharePoint link.

Sends to / links with · 2
  • Drawings — Import Document Management files into the Drawings tool with metadata. source
  • 360 Reporting — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
Receives from · 2
  • Workflows — Approval workflow on Document Management documents (select regions). source
  • Custom Fields — Company Admin custom fields/fieldsets apply to these 24 tools. source

Schedule

Design & Documents · Company and project level · 3 out · 0 in

Procore support

Project schedule (imported MS Project/P6 etc.); tasks feed Daily Log and Submittal schedule fields.

Procore AI agents that act here: Procurement Log Creator Agent, Schedule Analyst Agent

Sends to / links with · 3
  • Submittals — A submittal's Schedule Task field ties it to a schedule task for required-on-site/lead-time calculations. source
  • Daily Log — Scheduled Work entries carry resource and task name from schedule tasks for that day. source
  • 360 Reporting — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
Receives from · 0
  • Nothing purpose-built.

Photos

Design & Documents · Project level · 5 out · 1 in

Procore support

Project photo albums.

Procore AI agents that act here: Daily Log Agent, Field Observations Agent, Photo Analyst Agent, Site Safety Agent

Sends to / links with · 5
  • Drawings — Photos can be pinned to drawing locations. source
  • Daily Log — Photos attach to the Daily Log (Photos section). source
  • Action Plans — Add photos from the Photos tool as action plan records. source
  • 360 Reporting — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Project Map — Photos with GPS data display as pins on the Project Map; pins can be placed from the map and written back. source
Receives from · 1
  • Locations — Items in these tools carry a multi-tiered location from the project Admin Locations Manager. source

Project Communication

RFIs GADraft RFI with AI: Beta

Project Communication · Project level · 9 out · 4 in

Procore support

Requests for information; hub for creating change events, PCOs, correspondence, instructions.

Procore AI agents that act here: Change Analyst Agent, Deep Search Agent, Lessons Learned Agent, RFI Agent

Sends to / links with · 9
  • Drawings — Create or link RFIs on a drawing markup. source
  • Change Events — Create a change event from an RFI. source
  • Correspondence — Create a correspondence item from an RFI. source
  • Prime Change Orders — Create a potential change order from an RFI. source
  • 360 Reporting — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Transmittals — Add an RFI as a transmittal item. source
  • Project Map — RFIs with location data display as pins on the Project Map (mobile). source
  • Conversations — Send a message about an RFI; the thread appears on the item and in Conversations. source
  • Connection Manager — Closed, non-private RFIs copy read-only to the downstream project's External RFIs tab, where they can be linked to internal RFIs. source
Receives from · 4

Submittals

Project Communication · Project level · 6 out · 5 in

Procore support

Submittal log, packages, workflows; Schedule Task field.

Procore AI agents that act here: Deep Search Agent, Procurement Log Creator Agent, Submittal Review Agent

Sends to / links with · 6
  • Drawings — Link submittals on a drawing markup. source
  • Action Plans — Create new or link submittals as records. source
  • 360 Reporting — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Transmittals — Add a submittal or submittal package as a transmittal item. source
  • Conversations — Send a message about a submittal; the thread appears on the item and in Conversations. source
  • Connection Manager — Distributed submittals copy read-only to the downstream project's External Items tab (open beta). source
Receives from · 5
  • Specifications — Submittal Builder generates submittals from vector-PDF spec sections. source
  • Schedule — A submittal's Schedule Task field ties it to a schedule task for required-on-site/lead-time calculations. source
  • Locations — Items in these tools carry a multi-tiered location from the project Admin Locations Manager. source
  • Custom Fields — Company Admin custom fields/fieldsets apply to these 24 tools. source
  • Assets — Link submittals, RFIs, punch items, incidents, schedule activities and inspection items to an asset from its Related Items tab. source

Correspondence

Project Communication · Project level · 5 out · 4 in

Procore support

Configurable correspondence types; create & link RFIs/change events.

Sends to / links with · 5
  • Drawings — Link correspondence items on a drawing markup. source
  • Action Plans — Create new or link correspondence as records. source
  • Change Events — Create & Link a change event from a correspondence item (permanent link). source
  • RFIs — Create & Link an RFI from a correspondence item. source
  • 360 Reporting — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
Receives from · 4
  • RFIs — Create a correspondence item from an RFI. source
  • Workflows — Approval workflow on Correspondence/Custom Tool types. source
  • Locations — Items in these tools carry a multi-tiered location from the project Admin Locations Manager. source
  • Custom Fields — Company Admin custom fields/fieldsets apply to these 24 tools. source

Daily Log

Project Communication · Project level · 5 out · 7 in

Procore support

Daily field record with ~20 sections incl. Timecards, Equipment, Scheduled Work, Productivity.

Procore AI agents that act here: Daily Log Agent, Lessons Learned Agent

Sends to / links with · 5
  • Timesheets (Project) — Timesheet entries auto-populate the Daily Log Timecards section, and Daily Log timecards auto-populate project Timesheets. source
  • Timesheets (Company) — Daily Log Timecards carry over to the company Timecard and Company Timesheets tools. source
  • Equipment — Daily Log equipment entries pick from the project Equipment tool or company register; equipment timesheets sync with Daily Log entries when fieldsets match. source
  • 360 Reporting — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Budget — Hours and installed quantities on Daily Log timecard entries show in the Budget's Labor Productivity Cost view (Resource Tracking customers; a 'Timesheet Hours' column can be added to other budget views). source
Receives from · 7
  • Photos — Photos attach to the Daily Log (Photos section). source
  • Schedule — Scheduled Work entries carry resource and task name from schedule tasks for that day. source
  • Directory — Resources for Scheduled Work must exist in the Project Directory. source
  • Commitments — Unit/Quantity-based subcontracts and POs appear in the Daily Log Productivity section. source
  • Locations — Items in these tools carry a multi-tiered location from the project Admin Locations Manager. source
  • Custom Fields — Company Admin custom fields/fieldsets apply to these 24 tools. source
  • Forms — Attach completed forms (checklists, inspections, permits, sign-offs) from the Forms tool to a Daily Log entry in the mobile app. source

Meetings

Project Communication · Project level · 5 out · 0 in

Procore support

Agendas/minutes; create tasks and change events from items.

Procore AI agents that act here: Meeting Minutes Publisher Agent

Sends to / links with · 5
  • Action Plans — Create new or link meetings as records. source
  • Tasks — Create a task from a meeting agenda item; it also populates the Tasks tool. source
  • Change Events — Create a change event from a meeting; meeting details carry over and the meeting is linked in the change event's Origin field. source
  • 360 Reporting — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Conversations — Link a meeting in a message. legacy source
Receives from · 0
  • Nothing purpose-built.

Tasks

Project Communication · Project level · 2 out · 1 in

Procore support

Project task list; receives tasks created in Meetings.

Procore AI agents that act here: Meeting Minutes Publisher Agent

Sends to / links with · 2
  • 360 Reporting — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Conversations — Link a task in a message. legacy source
Receives from · 1
  • Meetings — Create a task from a meeting agenda item; it also populates the Tasks tool. source

Emails

Project Communication · Project level · 2 out · 0 in

Procore support

Project email log; create change event from an email.

Procore AI agents that act here: Daily Log Agent

Sends to / links with · 2
Receives from · 0
  • Nothing purpose-built.

Transmittals

Project Communication · Project level · 1 out · 7 in

Procore support

A documented record of project information sent to others. Items from other tools are added as line items and the transmittal is emailed to recipients for an audit trail.

Sends to / links with · 1
Receives from · 7

Field & Quality

Inspections

Field & Quality · Project level · 6 out · 3 in

Procore support

Checklist inspections; create observations from items.

Sends to / links with · 6
  • Drawings — Link inspections on a drawing markup. source
  • Observations — Create an observation from a failed/deficient inspection item; Origin links back. source
  • Action Plans — Create new or link existing inspections as action plan records. source
  • 360 Reporting — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Project Map — Inspections with location data display as pins on the Project Map; pins can be placed from the map and written back. source
  • Assets — Selecting an asset on an inspection links the inspection to that asset as a related item; bulk-creating inspections by asset is in open beta. source
Receives from · 3
  • Equipment — Create inspections for equipment. source
  • Locations — Items in these tools carry a multi-tiered location from the project Admin Locations Manager. source
  • Custom Fields — Company Admin custom fields/fieldsets apply to these 24 tools. source

Observations

Field & Quality · Project level · 6 out · 6 in

Procore support

Quality/safety/commissioning observations; origin for change events.

Procore AI agents that act here: Field Observations Agent

Sends to / links with · 6
  • Drawings — Link observations on a drawing markup. source
  • Change Events — Create a change event from an observation. source
  • Action Plans — Create new or link observations as references and records. source
  • 360 Reporting — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Project Map — Observations with location data display as pins on the Project Map; pins can be placed from the map and written back. source
  • Conversations — Send a message about an observation; the thread appears on the item and in Conversations. source
Receives from · 6
  • Inspections — Create an observation from a failed/deficient inspection item; Origin links back. source
  • Models — Create an observation from a model (iOS). source
  • Incidents — From an incident action, optionally Create Observation in the Observations tool. source
  • Locations — Items in these tools carry a multi-tiered location from the project Admin Locations Manager. source
  • Custom Fields — Company Admin custom fields/fieldsets apply to these 24 tools. source
  • Assets — Create an observation for one or many assets from the Assets tool; the asset field is pre-filled and the observation is linked back. source

Punch List

Field & Quality · Project level · 5 out · 2 in

Procore support

Punch items; pin to drawings.

Sends to / links with · 5
  • Drawings — Add punch list items to a drawing / link on markup. source
  • 360 Reporting — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Transmittals — Add a punch list item as a transmittal item. source
  • Project Map — Punch items with location data display as pins on the Project Map; pins can be placed from the map and written back. source
  • Conversations — Send a message about a punch item; the thread appears on the item and in Conversations (not yet on iOS). source
Receives from · 2
  • Locations — Items in these tools carry a multi-tiered location from the project Admin Locations Manager. source
  • Custom Fields — Company Admin custom fields/fieldsets apply to these 24 tools. source

Incidents

Field & Quality · Project level · 4 out · 3 in

Procore support

Safety incident records; actions can create observations; Equipment field.

Sends to / links with · 4
  • Observations — From an incident action, optionally Create Observation in the Observations tool. source
  • 360 Reporting — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Project Map — Incidents with location data display as pins on the Project Map; pins can be placed or moved from the map and written back to the item. source
  • Conversations — Link an incident in a message. legacy source
Receives from · 3
  • Equipment — Incident Equipment field pulls from the Equipment tool. source
  • Locations — Items in these tools carry a multi-tiered location from the project Admin Locations Manager. source
  • Custom Fields — Company Admin custom fields/fieldsets apply to these 24 tools. source

Action Plans

Field & Quality · Project level · 8 out · 5 in

Procore support

Planned sequences of items with references and required records from six tools.

Sends to / links with · 8
  • Inspections — Create new or link existing inspections as action plan records. source
  • Observations — Create new or link observations as references and records. source
  • Submittals — Create new or link submittals as records. source
  • Forms — Create new or link forms as records. source
  • Correspondence — Create new or link correspondence as records. source
  • Meetings — Create new or link meetings as records. source
  • 360 Reporting — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Assets — Create one action plan per selected asset from a template, each linked to its asset (beta). source
Receives from · 5
  • Photos — Add photos from the Photos tool as action plan records. source
  • Documents — Attach files from Documents (and Drawings, Forms) as action plan records. source
  • Drawings — Attach drawings as action plan attachments. source
  • Locations — Items in these tools carry a multi-tiered location from the project Admin Locations Manager. source
  • Custom Fields — Company Admin custom fields/fieldsets apply to these 24 tools. source

Forms

Field & Quality · Project level · 4 out · 0 in

Procore support

Fillable PDFs from company Admin templates.

Sends to / links with · 4
  • Action Plans — Create new or link forms as records. source
  • 360 Reporting — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Daily Log — Attach completed forms (checklists, inspections, permits, sign-offs) from the Forms tool to a Daily Log entry in the mobile app. source
  • Conversations — Link a form or attach form files to a message. source
Receives from · 0
  • Nothing purpose-built.

Locations

Field & Quality · Project level · 15 out · 1 in

Procore support

Multi-tiered location hierarchy managed in project Admin; used by 16 tools.

Sends to / links with · 15
  • Action Plans — Items in these tools carry a multi-tiered location from the project Admin Locations Manager. source
  • Commitments — Items in these tools carry a multi-tiered location from the project Admin Locations Manager. source
  • Correspondence — Items in these tools carry a multi-tiered location from the project Admin Locations Manager. source
  • Daily Log — Items in these tools carry a multi-tiered location from the project Admin Locations Manager. source
  • Incidents — Items in these tools carry a multi-tiered location from the project Admin Locations Manager. source
  • Inspections — Items in these tools carry a multi-tiered location from the project Admin Locations Manager. source
  • Observations — Items in these tools carry a multi-tiered location from the project Admin Locations Manager. source
  • Photos — Items in these tools carry a multi-tiered location from the project Admin Locations Manager. source
  • Prime Contracts — Items in these tools carry a multi-tiered location from the project Admin Locations Manager. source
  • Punch List — Items in these tools carry a multi-tiered location from the project Admin Locations Manager. source
  • RFIs — Items in these tools carry a multi-tiered location from the project Admin Locations Manager. source
  • Submittals — Items in these tools carry a multi-tiered location from the project Admin Locations Manager. source
  • Timesheets (Project) — Items in these tools carry a multi-tiered location from the project Admin Locations Manager. source
  • Materials — Project storage locations are used as storage, to and from locations on receipts, transfers and issues. source
  • Project Map — Draw point, path or polygon geometry for a location on the map; geometry stays synchronized with the Locations tool. source
Receives from · 1

T&M Tickets GArate tables: beta

Field & Quality · Project level · 1 out · 2 in

Procore support

Time-and-materials tickets; create change event with all line items.

Sends to / links with · 1
  • Change Events — Create a change event from a T&M ticket; all line items transfer and the ticket links in the description. source
Receives from · 2

Equipment

Field & Quality · Company and project level · 6 out · 2 in

Procore support

Project equipment register fed by company Equipment; time in Timesheets/Daily Log; inspections; incidents.

Sends to / links with · 6
  • Timesheets (Project) — Track equipment time in Timesheets (equipment timesheets need not be linked to a person). source
  • Daily Log — Daily Log equipment entries pick from the project Equipment tool or company register; equipment timesheets sync with Daily Log entries when fieldsets match. source
  • Budget — "See time entered for equipment in your budget." source
  • Inspections — Create inspections for equipment. source
  • Incidents — Incident Equipment field pulls from the Equipment tool. source
  • T&M Tickets — Use equipment on T&M tickets. source
Receives from · 2

Project Map BetaTwo things share the name. Maps for Photos (the photo map) has been GA since 2025-01-08. The multi-tool Project Map is still listed as part of the Procore Home open beta on support pages updated 2026-09-16, with Assets added 2026-09-15. source

Field & Quality · Project level · 7 out · 1 in

Procore support

Procore Maps: one interactive map showing items from several tools as status-colored pins, with location drawing that stays synchronized with the Locations tool. Web only.

Sends to / links with · 7
  • Incidents — Incidents with location data display as pins on the Project Map; pins can be placed or moved from the map and written back to the item. source
  • Inspections — Inspections with location data display as pins on the Project Map; pins can be placed from the map and written back. source
  • Observations — Observations with location data display as pins on the Project Map; pins can be placed from the map and written back. source
  • Photos — Photos with GPS data display as pins on the Project Map; pins can be placed from the map and written back. source
  • Punch List — Punch items with location data display as pins on the Project Map; pins can be placed from the map and written back. source
  • Locations — Draw point, path or polygon geometry for a location on the map; geometry stays synchronized with the Locations tool. source
  • Assets — Assets with location data display as pins on the Project Map; pins can be placed from the map and written back. source
Receives from · 1
  • RFIs — RFIs with location data display as pins on the Project Map (mobile). source

Assets GAGA 2026-08-05 (North America, EMEA, APAC). Import from a 3D model is GA in the UK and Ireland and beta in North America; the admin setup guide is still labeled beta. source

Field & Quality · Company and project level · 5 out · 3 in

Procore support

The digital thread of a building's fixed assets — HVAC, fire protection, doors, switchgear — from installation through handover. A company-level Asset Register sets the type hierarchy; the project-level tool tracks installed assets, links related records, and exports the full history at turnover.

Sends to / links with · 5
  • Observations — Create an observation for one or many assets from the Assets tool; the asset field is pre-filled and the observation is linked back. source
  • 360 Reporting — Asset data is available in 360 Reporting at company and project level. source
  • Analytics 2.0 — Asset data is available in Procore Analytics. source
  • Project Map — Assets with location data display as pins on the Project Map; pins can be placed from the map and written back. source
  • Submittals — Link submittals, RFIs, punch items, incidents, schedule activities and inspection items to an asset from its Related Items tab. source
Receives from · 3
  • Inspections — Selecting an asset on an inspection links the inspection to that asset as a related item; bulk-creating inspections by asset is in open beta. source
  • Action Plans — Create one action plan per selected asset from a template, each linked to its asset (beta). source
  • Documents — Pull model objects from a BIM file in Documents or Document Management, filter by property, and map them to asset types for bulk import; assets can be viewed in the 3D model. source

Change Management

Change Events

Change Management · Project level · 8 out · 10 in

Procore support

Hub of change management; creates RFQs, CCOs, PCOs, commitments, budget changes.

Procore AI agents that act here: Change Analyst Agent, Financial Analyst Agent, Lessons Learned Agent

Sends to / links with · 8
  • RFQs — Create RFQs from change event lines and send to collaborators; quotes return to the lines. source
  • Commitment Change Orders — Create (or bulk-create) commitment change orders from change event lines; lines become CCO SOV. source
  • Prime Change Orders — Create a Prime PCO / Prime CO from change event lines; lines become SOV. source
  • Commitments — Create a subcontract or PO from change event lines, or add lines to an unapproved commitment's SOV. source
  • Budget — Create budget changes (adjustment + lines, amount or unit/qty) from change event lines; production quantities carry to the budget. source
  • Field Productivity — Approved change-order hours and quantities update the Field Production Report. source
  • 360 Reporting — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Conversations — Send a message about a change event; the thread appears on the item and in Conversations. source
Receives from · 10
  • RFIs — Create a change event from an RFI. source
  • Observations — Create a change event from an observation. source
  • Estimating — Send an estimate change order to the Change Events tool (costs only or full estimate with adjustments); budget codes update. source
  • T&M Tickets — Create a change event from a T&M ticket; all line items transfer and the ticket links in the description. source
  • Meetings — Create a change event from a meeting; meeting details carry over and the meeting is linked in the change event's Origin field. source
  • Correspondence — Create & Link a change event from a correspondence item (permanent link). source
  • Emails — Create a change event from an email; the email becomes the Origin Item. source
  • Budget — Creating a budget change automatically creates a linked change event. source
  • Commitments — Field-initiated change orders submitted by collaborators can auto-create change events (Beta). source
  • Custom Fields — Company Admin custom fields/fieldsets apply to these 24 tools. source

RFQs GAfeature of Change Events

Change Management · Project level · 2 out · 0 in

Procore support

Requests for quote sent from change event lines.

Sends to / links with · 2
  • Change Events — Create RFQs from change event lines and send to collaborators; quotes return to the lines. source
  • Commitment Change Orders — Once a sub's RFQ quote is reviewed and set to 'Pending Final Approval', a commitment change order created from those change event lines fills its schedule of values with the quoted amounts. source
Receives from · 0
  • Nothing purpose-built.

Prime Change Orders

Change Management · Project level · 2 out · 4 in

Procore support

Potential and approved owner-contract change orders.

Sends to / links with · 2
  • Prime Contracts — Approved change orders revise the prime contract value. source
  • ERP Integrations — Prime contract change orders export (Procore→Vista; Procore→Workday as customer contract amendments). source
Receives from · 4
  • RFIs — Create a potential change order from an RFI. source
  • Change Events — Create a Prime PCO / Prime CO from change event lines; lines become SOV. source
  • Workflows — Approval workflow on prime contract change orders / PCOs. source
  • Custom Fields — Company Admin custom fields/fieldsets apply to these 24 tools. source

Commitment Change Orders

Change Management · Project level · 3 out · 4 in

Procore support

Change orders on subcontracts/POs.

Sends to / links with · 3
  • Commitments — Approved CCOs revise the commitment; ERP-integrated companies send approved CCOs to accounting. source
  • Invoicing — Only approved CCOs appear on the subcontractor invoice to bill. source
  • ERP Integrations — Commitment change orders export (Procore→Vista; Procore→Workday as supplier contract amendments). source
Receives from · 4
  • Change Events — Create (or bulk-create) commitment change orders from change event lines; lines become CCO SOV. source
  • Workflows — Approval workflow on commitment change orders / commitment PCOs (single, two or three tier). source
  • Custom Fields — Company Admin custom fields/fieldsets apply to these 24 tools. source
  • RFQs — Once a sub's RFQ quote is reviewed and set to 'Pending Final Approval', a commitment change order created from those change event lines fills its schedule of values with the quoted amounts. source

Contracts & Cost

Prime Contracts

Contracts & Cost · Project level · 4 out · 5 in

Procore support

Owner contract and SOV; owner invoices originate here.

Procore AI agents that act here: Contract Review Agent, Submittal Review Agent

Sends to / links with · 4
  • Budget — In Procore's standard budget view, approved prime contract change orders feed Approved COs and the Revised Budget. source
  • Invoicing — Owner invoices originate from an approved prime contract. source
  • ERP Integrations — Prime contracts sync (Vista→Procore; Workday customer contracts →Procore). source
  • Transmittals — Add a prime contract line item or potential change order as a transmittal item. source
Receives from · 5

Commitments

Contracts & Cost · Project level · 10 out · 9 in

Procore support

Subcontracts and POs with SOV/SSOV; Compliance tab.

Procore AI agents that act here: Contract Review Agent, Financial Analyst Agent, Submittal Review Agent

Sends to / links with · 10
  • Invoicing — Subcontractor invoices are built from the commitment's Subcontractor SOV detail lines. source
  • Budget — Commitment values roll into committed costs. source
  • ERP Integrations — Commitments sync to the ERP (Vista: Procore→Vista; Workday: supplier contracts Procore→Workday). source
  • Daily Log — Unit/Quantity-based subcontracts and POs appear in the Daily Log Productivity section. source
  • Change Events — Field-initiated change orders submitted by collaborators can auto-create change events (Beta). source
  • 360 Reporting — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Procore Pay — Procore Pay's "Insurance Compliant" payment requirement checks the commitment's status before releasing payment. source
  • Transmittals — Add a subcontract or purchase order as a transmittal item. source
  • Materials — Approved purchase orders and commitment change orders with described, unit-of-measure SOV lines appear in Materials as orders to receive. source
  • Conversations — Send a message about a commitment; the thread appears on the item and in Conversations. source
Receives from · 9
  • Bid Management — Award a bid and convert it to a subcontract or purchase order. source
  • Change Events — Create a subcontract or PO from change event lines, or add lines to an unapproved commitment's SOV. source
  • Commitment Change Orders — Approved CCOs revise the commitment; ERP-integrated companies send approved CCOs to accounting. source
  • Estimating — Create a purchase order from an estimate. source
  • Workflows — Approval workflow on Subcontract and Purchase Order items. source
  • Locations — Items in these tools carry a multi-tiered location from the project Admin Locations Manager. source
  • Custom Fields — Company Admin custom fields/fieldsets apply to these 24 tools. source
  • Insurance (Directory) — Commitment Compliance tab shows Directory insurance entries and an automatic Compliant / Not Compliant status. source
  • Bid Board — Create a purchase order in Commitments from a Bid Board estimate (after the estimate is sent to budget). source

Budget

Contracts & Cost · Project level · 6 out · 12 in

Procore support

Budget, budget changes, committed/actual costs, forecasts, Labor Productivity Cost view.

Procore AI agents that act here: Financial Analyst Agent

Sends to / links with · 6
  • ERP Integrations — Budgets sync with the ERP (Vista: both ways; budget modifications and forecasts Procore→Vista). source
  • Field Productivity — Importing a unit-quantity budget sets up the Field Production Report. source
  • Timesheets (Project) — Budgeted hours/quantities populate the pickers in Timesheets and My Time. source
  • Change Events — Creating a budget change automatically creates a linked change event. source
  • Conversations — Send a message about a budget item; the thread appears on the item and in the Conversations tool. source
  • Project Status Snapshots — Snapshots created from the Budget or Forecasting view are stored and surfaced in the company-level Project Status Snapshots tool. source
Receives from · 12
  • Estimating — Send to Budget copies the primary estimate's line items into the project Budget; its cost codes and amounts become the budget lines (Project Financials required). source
  • Timesheets (Project) — Timecard entry hours and installed quantities from Timesheets show in the Budget's Labor Productivity Cost view against budgeted hours and quantities (Resource Tracking customers). source
  • Change Events — Create budget changes (adjustment + lines, amount or unit/qty) from change event lines; production quantities carry to the budget. source
  • Prime Contracts — In Procore's standard budget view, approved prime contract change orders feed Approved COs and the Revised Budget. source
  • Commitments — Commitment values roll into committed costs. source
  • Direct Costs — Direct costs show in the budget's Direct Costs column and count toward Job to Date Costs. source
  • Equipment — "See time entered for equipment in your budget." source
  • Field Productivity — Approved production quantities appear in the Labor Productivity Cost budget view. source
  • Workflows — Approval workflow on Budget Change items. source
  • Bid Board — A Bid Board estimate reaches the Budget only after the project is added to Portfolio; Send to Budget is then run from the project's Estimating tool. source
  • Project Status Snapshots — A snapshot's status can be set from the company Project Status Snapshots tool or from the project Budget tool. source
  • Daily Log — Hours and installed quantities on Daily Log timecard entries show in the Budget's Labor Productivity Cost view (Resource Tracking customers; a 'Timesheet Hours' column can be added to other budget views). source

Direct Costs

Contracts & Cost · Project level · 2 out · 0 in

Procore support

Non-commitment costs (invoices, expenses, payroll) incl. imports from ERP.

Sends to / links with · 2
  • Budget — Direct costs show in the budget's Direct Costs column and count toward Job to Date Costs. source
  • ERP Integrations — Direct costs import from the ERP (Vista job costs/PR cost; Workday supplier invoices, journals, expense reports). source
Receives from · 0
  • Nothing purpose-built.

Invoicing GAowner invoices page still titled "Beta"

Contracts & Cost · Project level · 2 out · 6 in

Procore support

Subcontractor invoices (against commitments) and owner invoices (against prime contract).

Sends to / links with · 2
  • Procore Pay — Procore Pay pays approved subcontractor invoices and generates lien waivers on them. source
  • ERP Integrations — Subcontractor invoices export (Vista, Workday); owner invoices to QuickBooks Online (opt-in). source
Receives from · 6
  • Commitment Change Orders — Only approved CCOs appear on the subcontractor invoice to bill. source
  • Commitments — Subcontractor invoices are built from the commitment's Subcontractor SOV detail lines. source
  • Prime Contracts — Owner invoices originate from an approved prime contract. source
  • Workflows — Approval workflow on subcontractor invoices (progress claims) and owner invoices. source
  • Custom Fields — Company Admin custom fields/fieldsets apply to these 24 tools. source
  • Materials — Posting a receipt against your purchase order creates a draft invoice on that PO in the Invoicing tool: the supplier's bill to you (payable), not your billing to the GC. source

Project Status Snapshots GAGA 2025-08-11; financial periods on snapshots are still in beta. source

Contracts & Cost · Company level · 1 out · 1 in

Procore support

Company-level access to budget snapshots across all projects, with approval status for formal budget reviews.

Sends to / links with · 1
  • Budget — A snapshot's status can be set from the company Project Status Snapshots tool or from the project Budget tool. source
Receives from · 1
  • Budget — Snapshots created from the Budget or Forecasting view are stored and surfaced in the company-level Project Status Snapshots tool. source

Resource Management

Timesheets (Project)

Resource Management · Project level · 5 out · 7 in

Procore support

Crew time, cost codes and production quantities. The project half of Procore's Resource Tracking product, alongside Crews, T&M Tickets, Timecard and My Time.

Sends to / links with · 5
  • Daily Log — Timesheet entries auto-populate the Daily Log Timecards section, and Daily Log timecards auto-populate project Timesheets. source
  • Budget — Timecard entry hours and installed quantities from Timesheets show in the Budget's Labor Productivity Cost view against budgeted hours and quantities (Resource Tracking customers). source
  • Timesheets (Company) — Project Timesheets entries auto-populate Company Timecard and Company Timesheets; My Time entries flow to all. source
  • Field Productivity — Installed units and hours recorded during Timesheets time entry feed the Field Production Report. source
  • 360 Reporting — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
Receives from · 7
  • Equipment — Track equipment time in Timesheets (equipment timesheets need not be linked to a person). source
  • Resource Planning — Synced people can be assigned and appear in the Crews and Timesheets tools. source
  • Budget — Budgeted hours/quantities populate the pickers in Timesheets and My Time. source
  • Locations — Items in these tools carry a multi-tiered location from the project Admin Locations Manager. source
  • Custom Fields — Company Admin custom fields/fieldsets apply to these 24 tools. source
  • Crews — Add a crew to a timesheet so timecard entries can be created for its members. source
  • Directory — Timesheets draw people from the Directory: only people in the Directory who are marked as employees of your company can be added to a timesheet. source

Timesheets (Company) GACompany Timesheets timecard creation and Kiosk: Beta

Resource Management · Company level · 4 out · 2 in

Procore support

Company-level review and approval of time across projects; Company Timecard; My Time mobile; Kiosk.

Sends to / links with · 4
  • Timesheets (Project) — Project Timesheets entries auto-populate Company Timecard and Company Timesheets; My Time entries flow to all. source
  • 360 Reporting — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • ERP Integrations — Export Timesheets data from Procore for import into Sage 300 CRE payroll (file export; Sage 300 CRE only). source
  • Webhooks / REST API — A payroll integration can read timecard data through the REST API. On the Timesheets reference page: 'List all Timesheets' (GET /rest/v1.0/projects/{project_id}/timesheets) returns all timesheets for a project, and 'List Timecard Data' (GET /rest/v1.0/companies/{company_id}/timesheets, in the page's endpoint list) returns timecard data for all employees on all projects for the current work week or a date range you set. source
Receives from · 2
  • Daily Log — Daily Log Timecards carry over to the company Timecard and Company Timesheets tools. source
  • Custom Fields — Company Admin custom fields/fieldsets apply to these 24 tools. source

Resource Planning

Resource Management · Company level · 3 out · 1 in

Procore support

People list, assignments, requests; two-way people sync with Directory; feeds Crews/Timesheets.

Sends to / links with · 3
  • Directory — Two-way sync of first/last name, employee ID, mobile, email, status; job title RP→Directory only. source
  • Timesheets (Project) — Synced people can be assigned and appear in the Crews and Timesheets tools. source
  • 360 Reporting — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
Receives from · 1
  • Portfolio — Push projects from the Portfolio tool to Resource Planning (recommended when an ERP is integrated). source

Field Productivity GArequires Resource Management + Project Financials for cost view

Resource Management · Project level · 1 out · 3 in

Procore support

Unit-quantity budget, installed quantities from Timesheets, Field Production Report, Labor Productivity Cost budget view.

Sends to / links with · 1
  • Budget — Approved production quantities appear in the Labor Productivity Cost budget view. source
Receives from · 3
  • Timesheets (Project) — Installed units and hours recorded during Timesheets time entry feed the Field Production Report. source
  • Budget — Importing a unit-quantity budget sets up the Field Production Report. source
  • Change Events — Approved change-order hours and quantities update the Field Production Report. source

Resource Forecast BetaOpen beta via Procore Explore, available 2026-10-13 (successor to the Totals dashboard) source

Resource Management · Company level · 0 out · 0 in

Procore support

Resource Forecast, "rebuilt from the ground up" as the successor to the Totals dashboard, adds an interactive capacity chart above the data table, flags over-capacity periods in red, tracks equipment alongside labor, and switches among six units (people, hours, days, FTE, cost, utilization); open beta via Procore Explore, available October 13, 2026

Sends to / links with · 0
  • Nothing purpose-built.
Receives from · 0
  • Nothing purpose-built.

Materials GAGA 2026-06-30 per Procore's what's-new post; some support process guides still carry older beta wording. source

Resource Management · Project level · 1 out · 2 in

Procore support

Materials management on the platform: receive and manage inventory, issue and track materials as they move or are installed. Two process flows exist, with and without Procore Financials.

Sends to / links with · 1
  • Invoicing — Posting a receipt against your purchase order creates a draft invoice on that PO in the Invoicing tool: the supplier's bill to you (payable), not your billing to the GC. source
Receives from · 2
  • Commitments — Approved purchase orders and commitment change orders with described, unit-of-measure SOV lines appear in Materials as orders to receive. source
  • Locations — Project storage locations are used as storage, to and from locations on receipts, transfers and issues. source

Crews

Resource Management · Project level · 2 out · 0 in

Procore support

Groups of workers on a jobsite, each led by a Crew Lead or Foreman, used to build timesheets faster.

Sends to / links with · 2
  • Timesheets (Project) — Add a crew to a timesheet so timecard entries can be created for its members. source
  • Directory — Adding a worker in Crews also creates the worker as a contact in the Project and Company Directory; edits sync either way. source
Receives from · 0
  • Nothing purpose-built.

Company & Platform

Permissions / Admin

Company & Platform · Company and project level · 3 out · 1 in

Procore support

Company and project Admin tools: permission templates, fieldsets, locations, webhooks.

Sends to / links with · 3
  • 360 Reporting — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • ERP Integrations — Cost codes and cost types sync (Vista: both; Workday: Procore→Workday as project tasks) via company Admin/WBS. source
  • Connection Manager — Company Admin sets automatic or manual approval for incoming connection requests. source
Receives from · 1

Custom Fields

Company & Platform · Company and project level · 25 out · 0 in

Procore support

Company Admin custom fields and configurable fieldsets applied to 24 tools.

Sends to / links with · 25
Receives from · 0
  • Nothing purpose-built.

Workflows GAlegacy workflows deprecated per procore.com/whats-new

Company & Platform · Company and project level · 9 out · 0 in

Procore support

Self-serve approval workflows for financial, correspondence, Document Management and Payments items.

Sends to / links with · 9
Receives from · 0
  • Nothing purpose-built.

360 Reporting

Company & Platform · Company and project level · 0 out · 28 in

Procore support

Custom and single-tool reports across tools and projects.

Sends to / links with · 0
  • Nothing purpose-built.
Receives from · 28
  • Action Plans — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Permissions / Admin — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Change Events — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Commitments — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Coordination Issues — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Correspondence — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Daily Log — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Directory — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Documents — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Document Management — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Drawings — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Forms — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Incidents — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Inspections — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Meetings — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Observations — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Photos — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Punch List — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • RFIs — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Resource Planning — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Schedule — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Specifications — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Submittals — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Tasks — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Timesheets (Company) — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Timesheets (Project) — 360 Reporting builds reports from Action Plans, Admin, Change Events, Commitments, Coordination Issues, Correspondence, Daily Log, Directory, Documents, Document Management, Drawings, Forms, Incidents, Inspections, Instructions, Meetings, Observations, Photos, Punch List, RFIs, Resource Planning, Schedule, Specifications, Submittals, Tasks, Timecards, Timesheets (+ financial data). source
  • Connection Manager — Downstream projects build 360 Reports from External RFI and External RFI Response data sets. source
  • Assets — Asset data is available in 360 Reporting at company and project level. source

Analytics 2.0

Company & Platform · Company level · 0 out · 1 in

Procore support

Hourly-refreshed data model delivered to Power BI (reports, template, custom connector) via Databricks-based platform; Cloud Connector; bulk extract.

Features
  • Analytics data. Analytics 2.0 brings your company's Procore data together for reporting: Power BI reports on trends within and across your projects, and the data itself shared to your own reporting tools or data warehouse through the Cloud Connector. source Cloud Connector Procore product page
Sends to / links with · 0
  • Nothing purpose-built.
Receives from · 1
  • Assets — Asset data is available in Procore Analytics. source

Webhooks / REST API

Company & Platform · Company and project level · 0 out · 1 in

Procore support

Developer REST API resources and create/update/delete webhooks at company and project level.

Features
  • Webhooks. Company and project admins can let third-party developers and integrators subscribe to event notifications for Procore API resources when Create, Update, or Delete actions occur. Hooks are set at company or project scope, and the resources available to subscribe to are returned by the API itself ('List Webhooks Resources', GET /rest/v1.0/webhooks/resources). source Webhook Resources API Hooks API
Sends to / links with · 0
  • Nothing purpose-built.
Receives from · 1
  • Timesheets (Company) — A payroll integration can read timecard data through the REST API. On the Timesheets reference page: 'List all Timesheets' (GET /rest/v1.0/projects/{project_id}/timesheets) returns all timesheets for a project, and 'List Timecard Data' (GET /rest/v1.0/companies/{company_id}/timesheets, in the page's endpoint list) returns timecard data for all employees on all projects for the current work week or a date range you set. source

App Marketplace GAAgentic apps: closed beta source

Company & Platform · Company level · 0 out · 0 in

Procore support

The Procore App Marketplace offers "500+ partner integrations" that Company Admins install and apply to projects; apps combine Embedded (Full Screen in the Apps menu, 400-pixel Side Panel on chosen views), Data Connector (user-level OAuth plus optional DMSA), and Agentic (closed beta) capabilities, with Marketplace apps certified by Procore and private custom apps installed by Installation Key

Sends to / links with · 0
  • Nothing purpose-built.
Receives from · 0
  • Nothing purpose-built.

Procore AI GAProcore AI Go, a voice-first mobile app that answers questions from project data, entered public beta at Groundbreak 2026 (2026-10-21). source

Company & Platform · Company and project level · 0 out · 0 in

Procore support

Procore AI is "construction-tailored AI that works alongside your team in Procore" — a side panel for questions over project data plus 20 pre-built agents (Digital Coworker Starter Pack, Pro, Enterprise with Agent Studio) that stage every proposed action for human approval, follow existing Procore permissions, and are metered in Procore Credits

Sends to / links with · 0
  • Nothing purpose-built.
Receives from · 0
  • Nothing purpose-built.

Conversations GAGA per procore.com (2024-04-17); several support sub-pages still carry "(Beta)" labels. source

Company & Platform · Company and project level · 7 out · 9 in

Procore support

Messaging across projects in web and mobile: direct and group conversations, plus two item features: Item Conversations (a thread on the item itself) and Link Project Items (link an item into any message).

Features
  • Item Conversations. Message threads attached to a specific item. The thread shows on the item and in the Conversations tool. Supported in 7 tools: Budget, Change Events, Commitments, Observations, Punch List, RFIs, Submittals. source
  • Link Project Items. Link items from the project into any message. 14 tools: Change Events, Commitments, Coordination Issues, Documents, Drawings, Forms, Incidents, Meetings, Observations, Punch List, RFIs, Submittals, Tasks, Transmittals. source legacy source (tool list)
  • Summarize a conversation. Summarize a conversation with the built-in Summarize button, over a time range you pick. source
Sends to / links with · 7
  • Budget — Send a message about a budget item; the thread appears on the item and in the Conversations tool. source
  • Change Events — Send a message about a change event; the thread appears on the item and in Conversations. source
  • Commitments — Send a message about a commitment; the thread appears on the item and in Conversations. source
  • Observations — Send a message about an observation; the thread appears on the item and in Conversations. source
  • Punch List — Send a message about a punch item; the thread appears on the item and in Conversations (not yet on iOS). source
  • RFIs — Send a message about an RFI; the thread appears on the item and in Conversations. source
  • Submittals — Send a message about a submittal; the thread appears on the item and in Conversations. source
Receives from · 9

Connection Manager GAPer tool: Drawings GA 2024-10-22; RFIs GA 2026-01-20; Submittals open beta since 2026-04-21. source

Company & Platform · Project level · 1 out · 4 in

Procore support

Procore Connect: connects a project to another Procore project (same or different company) so Drawings, RFIs and Submittals sync one way from the upstream project to the downstream one.

Sends to / links with · 1
  • 360 Reporting — Downstream projects build 360 Reports from External RFI and External RFI Response data sets. source
Receives from · 4
  • Drawings — Published drawings and drawing areas sync from an upstream project to a downstream project and stay in sync; markups and custom fields are excluded. source
  • RFIs — Closed, non-private RFIs copy read-only to the downstream project's External RFIs tab, where they can be linked to internal RFIs. source
  • Submittals — Distributed submittals copy read-only to the downstream project's External Items tab (open beta). source
  • Permissions / Admin — Company Admin sets automatic or manual approval for incoming connection requests. source

Payment & Accounting

ERP Integrations GAMicrosoft Dynamics not among the 14

Payment & Accounting · Company level · 6 out · 7 in

Procore support

Company-level sync with 14 listed ERPs; object/direction per connector.

Sends to / links with · 6
  • Budget — Budgets sync with the ERP (Vista: both ways; budget modifications and forecasts Procore→Vista). source
  • Portfolio — "Send to ERP" during project creation; projects/jobs sync both ways (Vista, Workday). source
  • Directory — Vendors sync (Vista: both; Workday: Workday→Procore). source
  • Permissions / Admin — Cost codes and cost types sync (Vista: both; Workday: Procore→Workday as project tasks) via company Admin/WBS. source
  • Procore Pay — Payment amount/date/check number sync both ways for Sage Intacct, QBO/QBD, Vista, Acumatica, Yardi, CMiC, NetSuite; one-way flags for Sage 300 CRE and Workday. source
  • Cost Catalog — ERP cost codes can be added to the Cost Catalog for ERP-integrated companies and applied across Estimating and Bid Board; they carry to the budget when an estimate is sent. source
Receives from · 7
  • Commitments — Commitments sync to the ERP (Vista: Procore→Vista; Workday: supplier contracts Procore→Workday). source
  • Prime Contracts — Prime contracts sync (Vista→Procore; Workday customer contracts →Procore). source
  • Invoicing — Subcontractor invoices export (Vista, Workday); owner invoices to QuickBooks Online (opt-in). source
  • Direct Costs — Direct costs import from the ERP (Vista job costs/PR cost; Workday supplier invoices, journals, expense reports). source
  • Commitment Change Orders — Commitment change orders export (Procore→Vista; Procore→Workday as supplier contract amendments). source
  • Prime Change Orders — Prime contract change orders export (Procore→Vista; Procore→Workday as customer contract amendments). source
  • Timesheets (Company) — Export Timesheets data from Procore for import into Sage 300 CRE payroll (file export; Sage 300 CRE only). source

Procore Pay GAUS GCs/owner-builders

Payment & Accounting · Company and project level · 1 out · 3 in

Procore support

Pays approved subcontractor invoices; Levelset lien waivers; insurance-compliance gate.

Sends to / links with · 1
  • ERP Integrations — Payment amount/date/check number sync both ways for Sage Intacct, QBO/QBD, Vista, Acumatica, Yardi, CMiC, NetSuite; one-way flags for Sage 300 CRE and Workday. source
Receives from · 3
  • Invoicing — Procore Pay pays approved subcontractor invoices and generates lien waivers on them. source
  • Workflows — Payment workflow item in the company Payments tool. source
  • Commitments — Procore Pay's "Insurance Compliant" payment requirement checks the commitment's status before releasing payment. source

The financial chain ends in the ERP. Time ends in payroll. Everything else can leave through Analytics, webhooks, the REST API, or a Marketplace app. These are the documented exits, with the generic category named rather than any one company’s stack.

ERP / accounting (Procore's documented connectors) two-way

per the cited page: jobs/vendors/cost codes/budgets both; budget mods, forecasts, commitments, CCOs, PCCOs, sub invoices Procore→ERP; prime contract, job costs, direct costs ERP→Procore; payments both source

Tools involved: Budget, Commitments, Commitment Change Orders, Prime Contracts, Prime Change Orders, Invoicing, Direct Costs, Portfolio, Directory, Permissions / Admin, Procore Pay

Payroll / HCM out

Timecard data can be read through the REST API. The Timesheets reference lists 'List all Timesheets' (GET /rest/v1.0/projects/{project_id}/timesheets, one project) and 'List Timecard Data' (GET /rest/v1.0/companies/{company_id}/timesheets, all employees on all projects); the Timecard Entries reference adds 'List timecard entries (Company)'. Procore documents a Timesheets file export for Sage 300 CRE. Resource Planning takes a people and project sync from your system of record through Quick Connect, API, or SFTP. source Timecard Entries API Sage 300 CRE export Resource Planning integrations

Tools involved: Timesheets (Company), Timesheets (Project), Resource Planning, Webhooks / REST API

Business intelligence (Analytics 2.0 → Power BI) out

Analytics 2.0 Power BI reports, template and custom connector; Databricks-based; Cloud Connector; bulk extract; hourly refresh. Fabric is not named on the fetched pages. source

Tools involved: Analytics 2.0

Webhooks and REST API (any subscriber) out

Company/project webhooks POST JSON on create/update/delete; 28-day event history; retries then discard after 12 h source

Tools involved: Webhooks / REST API

App Marketplace and partner connectors (CRM, iPaaS, ERPs not natively listed) two-way

Marketplace apps and iPaaS connectors move projects, users, companies, RFIs, submittals, files and timecard entries in and out of Procore; the specific objects depend on the app. source

Tools involved: App Marketplace, Portfolio, Directory, RFIs, Submittals, Documents, Timesheets (Project)

Cloud file storage (SharePoint link into Document Management) in

Link files from a connected SharePoint site into Document Management Uploads (not available to US accounts per page) source

Tools involved: Document Management

Asset handover to owner operations (CMMS / EAM) out

Project-level asset register exports asset properties, linked records, attachments and edit history for facilities and maintenance systems; Procore and IBM announced a collaboration (2026-10-21) to carry asset data into IBM Maximo. COBie export is not yet available. source

Tools involved: Assets

Twenty named agents read from and write to specific tools. The mapping below is from Procore’s public agent pages. Packaging and pricing are deliberately left out — check procore.com/ai for current terms.

Bid Analyst Agent

Checks bids against project scopes, drawings, and specs to find gaps and exclusions.

Reads: Bid Management, Drawings, Specifications
Writes: —

Procore AI page

Bid Leveling Agent

Places subcontractor bids side by side in one matrix, highlighting missing scope and price differences.

Reads: Bid Management
Writes: Bid Management

Procore AI page

Change Analyst Agent

Reviews changes, RFIs, drawings, and records for scope shifts, cost exposure, and schedule risk.

Reads: Change Events, RFIs, Drawings, Documents
Writes: —

Procore AI page

Contract Review Agent

Compares contracts and drawings against internal benchmarks and flags conflicts.

Reads: Prime Contracts, Commitments, Drawings
Writes: —

Procore AI page

Daily Log Agent

Turn jobsite photos, emails, video, and voice memos into complete daily logs"; "drafts your daily logs for final human verification".

Reads: Photos, Emails
Writes: Daily Log

Procore AI page

Drawing Analyst Agent

Scans drawings for coordination issues, missing details, and constructability risks.

Reads: Drawings
Writes: —

Procore AI page

Drawings and Specs Specialist Agent

Cross-checks drawings against specs to catch conflicts and gaps.

Reads: Drawings, Specifications
Writes: —

Procore AI page

Field Observations Agent

Map photos, videos, and voice notes into categorized Procore Observations automatically"; drafts observations for review.

Reads: Photos
Writes: Observations

Procore AI page

Financial Analyst Agent

Track budget line items, commitments, and change events to stay ahead of potential cost overruns"; executive summary of cost trends.

Reads: Budget, Commitments, Change Events
Writes: —

Procore AI page

Lessons Learned Agent

Finds trends in RFIs, changes, and logs and turns them into reusable lessons and preventive actions.

Reads: RFIs, Change Events, Daily Log
Writes: —

Procore AI page

Meeting Minutes Publisher Agent

Turns "raw meeting recordings and notes" into structured notes with assigned action items; separates internal vs customer tasks.

Reads: Meetings
Writes: Meetings, Tasks

Procore AI page

Photo Analyst Agent

Reviews site photos for visible progress, installed work, and quality or safety concerns.

Reads: Photos
Writes: —

Procore AI page

Procurement Log Creator Agent

Extracts long-lead items, submittal requirements, and delivery dates from project files"; links submittal approvals to milestone dates; outputs an "exportable" structured log.

Reads: Submittals, Specifications, Drawings, Schedule
Writes: —

Procore AI page

RFI Agent

Analyzes project drawings and historical data to draft complete, pre-populated RFIs for your review.

Reads: Drawings, RFIs, Specifications
Writes: RFIs

Procore AI page

Schedule Analyst Agent

Reviews milestones, logic, and activity relationships to flag sequencing issues and delays.

Reads: Schedule
Writes: —

Procore AI page

Scope Writer Agent

Scans documents, drawings, and specs to extract tasks, deliverables, and requirements.

Reads: Documents, Drawings, Specifications
Writes: —

Procore AI page

Site Safety Agent

Identifies hazards from site photos, videos, and drawings and produces field-ready findings.

Reads: Photos, Drawings
Writes: —

Procore AI page

Submittal Review Agent

Cross-checks submittals against specs and contracts to flag compliance gaps.

Reads: Submittals, Specifications, Prime Contracts, Commitments
Writes: —

Procore AI page

The map only draws a handoff when Procore’s public documentation describes it. A few handoffs people commonly assume — a meeting item becoming an RFI, an inspection item going straight to a punch item — aren’t described there as of the map date, so they aren’t drawn. Some are real gaps. Some may be documented somewhere the public search didn’t reach. If you can point to the page, send it and the map gets updated.

Matt works for Procore. The risks in this guide don't care what software you use.  ·  Procore data as of 2026-10-29 · Map last updated 2026-11-03 · Out of scope by design: capitalplanning, instructions, prequal, procurement.

Document well. Stay safe. Get home to your family.

© 2026 Matt Kelly · The Rebuild · MattShawnKelly.com

The Rebuild — Matt Kelly

Construction technology, field leadership, faith, and starting over. Delivered to your inbox.

Learn More